The floor within the hanger could handle pedestrian traffic after 16 hours, however the helicopter could only be placed within the hanger after it had fully chemically cured 7 days post installation. The installation was carried out over three days, with RESYN's installers working efficiently to minimise the amount of time the high-value equipment was out of the facility. RESYN's collaboration with Rase Steels and expert product knowledge ensured the end result was a durable, low maintenance resin floor that is well suited to the demanding environment.