IFT delivers on Ducati motorcycle village

IFT was approached by Pacific Building to give advice on a flooring system for the new workshop at Ducati, Glasgow. This was part of their contract to deliver a new £10 million motorcycle ‘village’.

The works were carried out over one week from initial preparation through to final seal. IFT fully prepared the existing substrate before installing 260m2 of the Flowfast Quartz Classic system.

Flowfast Quartz is a fast curing trowel applied system available in a mix of attractive colours. It offers chemical, wear and slip resistance. Other benefits of the system include that it’s seamless, durable finish offers a great solution both for hygiene and heavy industrial use, including an excellent slip resistant profile.

Ducati Glasgow, Triumph Glasgow and West Coast Harley Davidson are now well positioned in state-of-the art premises with a workshop floor to go alongside the high level of fit-out. IFT are delighted to have been involved in the production of this impressive end-result.

 

Credits