Ronacrete screeds at the O2 shopping centre

Ronacrete products have helped transform a former pub at the O2 shopping centre in north London into three separate retail outlets

Wates Construction was contracted to refit a former Wetherspoons pub at the O2 shopping centre in north London, turning the space into three separate retail outlets. Part of this project involved the levelling of the floor. 950 m2 of screed was laid at retail outlets in the O2 shopping centre. The products used were Ronafix Mix A, and RonaScreed 8 day Overlay Fast Drying Screed. Ronafix Mix A was required for thinly bonded levelling screeds and RonaScreed 8 Day Overlay was used to shorten the drying time of thicker screeds, to reduce waiting time before floor finishes could be laid and allowing the early return of site traffic. Two Ronacrete products were recommended for the project, Ronafix Mix A* which could be applied in thin section and RonaScreed 8 Day Overlay Fast Drying Screed which was added to the screed mix where thicker screeds were required. The thickness of some areas of screed was in excess of 100 mm and there was not sufficient available time for drying of traditional screeds. The addition of RonaScreed 8 Day Overlay Fast Drying Screed additive to the mix ensured fast return to use by site traffic and early drying, ready for application of floor finishes so that shops could be opened without delay.

 

Credits