To prepare the surface for the new flooring system, we carried out a full mechanical preparation process using Husqvarna planetary diamond grinders with dust extraction. This removed existing finishes, oil contamination, and swarf while exposing any areas needing repair.
Size: 300m²
Duration: 4 days
Products Used:
FeRFA Type 3 system
The result is a hard-wearing, easy-to-maintain flooring system that enhances safety, performance, and aesthetics within the workshop, supporting Coleg Gwent in delivering industry-leading automotive training.